Cherokee Lane Elementary - 8

Prince George's County Public Schools

EPISODE 5: Not Connections, But Re-Connections. We are NOT connecting  MEP/HVAC systems at the Cherokee Lane Elementary School job site. We are RE-connecting them. RE-connecting. Because they were originally connected at our factory. And those connections were tested and passed  inspection. Then they were DIS-connected for transport. And we will  RE-connect them during installation.

 

That’s the beauty of  MODLOGIQ’s “Build Together” method. All the MEP and HVAC work, fire  suppression systems, drywall, ceilings, etc. are all built together in the fully-assembled modules. Just as they would be built together on a conventional construction project.