Cherokee Lane Elementary - 8
Prince George's County Public Schools
EPISODE 5: Not Connections, But Re-Connections. We are NOT connecting MEP/HVAC systems at the Cherokee Lane Elementary School job site. We are RE-connecting them. RE-connecting. Because they were originally connected at our factory. And those connections were tested and passed inspection. Then they were DIS-connected for transport. And we will RE-connect them during installation.
That’s the beauty of MODLOGIQ’s “Build Together” method. All the MEP and HVAC work, fire suppression systems, drywall, ceilings, etc. are all built together in the fully-assembled modules. Just as they would be built together on a conventional construction project.