EDWARD J. HOPKINS
ELEMENTARY SCHOOL

K-12 CLASSROOM ADDITION

CLIENT

Town of Hopkinton – Hopkinton Public Schools

LOCATION

Hopkinton, MA

SIZE

 3,680 SF

TIMELINE

18 weeks

Despite a tight budget, the new addition had to match
the look of the current school building. Metal panels
were skillfully fabricated to mimic the colors and patterns
of existing brick and stucco finishes. High-performance
windows not only matched the existing ones, but helped
the project exceed the code minimum comcheck by
8% (envelope). The new interiors mirrored the 25’ x 28’
dimensions of the existing classrooms and featured built-in
casework, doors, ceilings, floor tiles, and paint that precisely
matched the finishes in the existing classrooms.

 

Building Information Modeling (BIM) and our unique “Build
Together” method accelerated the construction process
and allowed 95% of the project be completed off site. This
minimized site impact dramatically and was critical to the
project being ready for the start of the fall semester even as
the COVID-19 crisis surged.


Value engineering and innovations such as flipping a single
module unit on its end for the 2-story connecting corridor
delivered substantial savings while also helping speed
installation at the site. Off-site construction outside the
prevailing wage standards in Massachusetts also provided
budget savings, allowing MODLOGIQ to deliver true Cost
Certainty under highly uncertain (pandemic) conditions—
while minimizing site impact and speeding completion.